Smart Home Renovation Checklist: What to Plan Before You Start
Essential checklist for adding smart home technology during renovation. What to wire, where to plan, and how to future-proof your Dubai home.
Renovating or building a new home is the perfect opportunity to add smart home infrastructure. Planning now saves money and enables features that are difficult or impossible to add later. Use this checklist to ensure you don’t miss anything.
The Golden Rule
Add infrastructure during construction, add devices later.
Wiring and conduit cost 10x more to add after walls are closed. Devices can be upgraded any time. Focus your renovation planning on infrastructure.
Essential Infrastructure Checklist
Networking Infrastructure
Backbone Cabling
- CAT6A to all rooms (minimum 2 drops per room)
- CAT6A to all ceiling light locations
- CAT6A to TV locations (behind wall)
- CAT6A to potential camera locations
- Fiber backbone between floors (future-proofing)
- Conduit to outdoor areas
Server/Network Room
- Dedicated space for network equipment
- Adequate power (consider UPS)
- Ventilation/cooling
- Access for maintenance
- Minimum 1m x 1m space
WiFi Access Point Locations
- Central ceiling locations per floor
- CAT6A + power to each location
- Avoid near microwaves/thick walls
- Consider outdoor AP locations
Electrical Planning
Switch Boxes
- Deep boxes (45mm+) for smart switches
- Neutral wire at all switch locations
- Multi-gang boxes where appropriate
- Plan for keypad locations
Dedicated Circuits
- Server/network rack
- Home theater equipment
- HVAC control systems
- Security system
- EV charger (if applicable)
Smart Device Power
- Power behind mirrors (smart mirrors)
- Under-cabinet outlets (kitchen)
- Inside cabinets (motorized TV lifts)
- Ceiling power for motorized shading
Lighting Infrastructure
Wiring Method
- Star wiring to lighting panel (preferred)
- OR neutral at every switch location
- Consider DALI for commercial-grade
Dimming Preparation
- LED-compatible wiring
- Sufficient wire gauge for LED drivers
- Plan for color-tunable fixtures
Specialty Lighting
- Cove lighting power and control
- Landscape lighting conduit
- Pool/fountain lighting
- Art lighting with dimming
Shading Infrastructure
Window Treatment Prep
- Power at each window head
- Recessed pocket for roller blinds
- Curtain track pocket depth
- Low voltage vs line voltage
Control Wiring
- CAT6 or shading bus to each window
- Group control locations
- Integration with home automation
Climate Control
HVAC Integration
- Thermostat wiring (C-wire important)
- Zone damper control wiring
- VRF system integration planning
- Duct sensors for zone monitoring
Indoor Air Quality
- CO2 sensor locations
- Humidity sensor placement
- ERV/HRV integration points
Security Infrastructure
Camera Locations
- Entry points (all doors)
- Driveway/parking
- Perimeter coverage
- Indoor optional locations
- Height: 2.5-3m optimal
Access Control
- Electric strike/mag lock wiring at doors
- Intercom wiring to entry points
- Gate automation power and control
Alarm System
- Control panel location
- Sensor wire runs (or wireless zones)
- Siren locations
- Monitoring communication
Audio/Visual Infrastructure
Speaker Wiring
- In-ceiling speaker locations
- In-wall speaker locations
- Outdoor speaker locations
- Subwoofer locations (dedicated)
Display Locations
- TV power (in-wall with conduit)
- HDMI/AV conduit to TV locations
- Projector ceiling box
- Control screen recesses
Home Theater
- Dedicated room consideration
- Acoustic treatment planning
- Equipment rack location
- Seating/row wiring
Specialty Systems
Motorized Features
- Motorized TV lift power
- Fireplace control wiring
- Motorized art frame power
- Garage door integration
Outdoor Living
- Pergola automation wiring
- Outdoor kitchen control
- Pool equipment integration
- Landscape lighting circuits
Room-by-Room Checklist
Living Room
- 4+ CAT6A drops
- Multiple switch locations for scenes
- TV power and AV conduit
- Speaker wire to 4-6 ceiling locations
- Subwoofer location power/signal
- Window treatment power (all windows)
- Fireplace control (if applicable)
Master Bedroom
- 2+ CAT6A drops (each side of bed)
- Reading light control each side
- Blackout shade motor power
- Speaker wire to ceiling
- TV location power/conduit
- Bathroom visual/audio link
Kitchen
- CAT6A near cooking area
- Under-cabinet outlet runs
- Appliance integration consideration
- Voice assistant power location
- Display/tablet mount location
Home Office
- 4+ CAT6A drops (desk location)
- Dedicated circuit for equipment
- Video conferencing lighting
- Acoustic treatment consideration
- Display power locations
Bathroom
- Mirror power/data
- Exhaust fan with humidity sensor
- Heated floor control integration
- Speaker location (rated for moisture)
- Shower speaker/light
Garage
- CAT6A for camera
- EV charger circuit (40A+)
- Door sensor wiring
- Opener integration
- Storage area lighting control
Contractor Coordination Tips
Timing is Critical
Week 1-2: Plan with smart home consultant Before Drywall: All wiring complete After Rough-In: Document everything Before Painting: Install rough devices Final: Commission and program
Documentation Required
Provide contractors with:
- Wiring diagram/drawings
- Box depth requirements
- Wire type specifications
- Labeling requirements
- Conduit size requirements
Common Contractor Mistakes
Prevent These:
- Standard shallow switch boxes (need deep)
- Missing neutral wires at switches
- CAT5e instead of CAT6A
- Staples damaging CAT cable
- Insufficient conduit size
- Wrong wire gauge for runs
Budget Allocation
Where to Invest
High Priority:
- Network infrastructure (20% of tech budget)
- Electrical capacity and wiring (25%)
- Shading infrastructure (15%)
- Lighting wiring (15%)
Medium Priority:
- Speaker wiring (10%)
- Camera infrastructure (5%)
- Security wiring (5%)
Can Add Later:
- Actual devices and fixtures
- Programming and setup
- Non-essential features
Cost Estimates
| Item | Budget Range (AED) |
|---|---|
| Network infrastructure (villa) | 15,000-35,000 |
| Smart electrical prep | 10,000-25,000 |
| Shading infrastructure | 8,000-20,000 |
| AV pre-wire | 8,000-18,000 |
| Security pre-wire | 5,000-12,000 |
Working with Your Contractor
What to Communicate
- This is infrastructure, not decoration - Needs to be right
- Wire before closing walls - No exceptions
- Document everything - Photos of all runs
- Label all wires - Both ends
- Test before closing - Continuity checks
Red Flags
Watch for contractors who:
- Resist smart home planning
- Want to “figure it out later”
- Don’t understand neutral wire importance
- Use inappropriate materials
- Rush the infrastructure phase
Final Verification
Before Closing Walls
- All CAT6A tested for continuity
- All speaker wire tested
- All boxes at correct depth
- All runs photographed
- All wires labeled
- Conduit pathways clear
- Neutral wires confirmed at switches
After Completion
- Network speed tested
- WiFi coverage verified
- All circuits tested
- Device locations confirmed
- Integration points documented
Conclusion
Renovation is your one chance to get infrastructure right. Focus on:
- Wiring and conduit over devices
- Documentation of everything
- Future-proofing with extra capacity
- Coordination with all trades
- Verification before closing walls
The investment in proper infrastructure during renovation pays dividends for decades through easier upgrades, better reliability, and more capabilities.